Material Selection: Choose oil-resistant, cold-resistant, seawater-resistant, and aging-resistant rubber materials such as PVC.
Pre-treatment: Clean and dry the rubber materials to ensure no oil stains, dust, or impurities remain on the surface.
2. Positioning and Placement
Positioning Holes and Pins: Set corresponding positioning guide holes on the upper and lower sealing edges of the oil boom body. Position the oil boom on the worktable using pre-set positioning holes and pins for initial alignment.
Guide Rollers: Place guide rollers inside the oil boom body to flatten and evenly spread the material.
3. Thermal Bonding Operation
Thermal Bonding Machine Setup: Ensure the thermal bonding machine is in proper working condition and connected to one side of the worktable.
Bonding Process: Perform thermal bonding on the upper and lower sealing edges using heat and pressure to create a strong bond between materials.
Adjustments: The thermal bonding machine is movably connected to the base, allowing easy repositioning to accommodate varying processing requirements.
4. Quality Control
Positioning Reliability: Verify the accuracy of positioning holes and pins to ensure stable alignment during bonding.
Flatness Inspection: Check for smoothness and uniformity post-bonding, eliminating visible warping or unevenness.
Strength Testing: Conduct tensile and pressure resistance tests to confirm the oil boom meets durability standards.
5. Post-Processing
Quality Inspection: Perform comprehensive checks, including visual inspections and performance tests, on the finished oil boom.
Storage and Transportation: Ensure proper storage and transportation to prevent damage or deformation during handling.
1. Material Preparation Material Selection: Choose oil-resistant, cold-resistant, seawater-resistant, and aging-resistant rubber materials such as PVC…