The main purpose of the positioning design of the oil containment boom is to ensure the stability and reliability of the oil containment boom during assembly and use. Precise positioning reduces performance degradation or failure due to improper installation or displacement.
1. Location determination
The positioning guide holes of the upper and lower sealing edges should be set in the key parts of the oil containment boom, such as the connection with the floating body, the skirt body and other components.
The selection of the location should take into account the overall structure and use needs of the oil containment boom to ensure that the pilot hole can effectively play a positioning role.
2. Size design
The diameter of the positioning guide hole should be determined according to the size of the positioning column or pin used to ensure that they can fit tightly.
In general, the diameter of the positioning guide hole should be slightly larger than the diameter of the positioning column or pin, so that there is a certain adjustment space in the assembly.
3. Material selection
The material of the positioning guide hole should be compatible with other components of the oil containment boom and have good corrosion resistance, wear resistance and strength.
Commonly used materials include stainless steel, aluminum alloy and so on.
4. Design of positioning hole on workbench
(1) Location and quantity
The positioning holes on the work table should be determined according to the position and number of the positioning guide holes on the upper and lower sealing edges of the oil containment boom.
Each positioning guide hole should have a corresponding positioning hole on the workbench to ensure that the oil containment boom can be accurately placed on the workbench.
(2) Size and depth
The diameter of the positioning hole should match the diameter of the positioning guide hole to ensure that the positioning column or pin can pass smoothly.
The depth of the positioning holes should be determined according to the length of the positioning posts or pins to ensure that they can be fully inserted and secured in the positioning holes.
(3) Layout and arrangement
The layout and arrangement of positioning holes should take into account the shape and size of the oil containment boom, as well as the size and shape of the workbench.
Positioning holes should be evenly distributed on the workbench so that the oil containment boom can be placed and fixed smoothly.
5. Design points and precautions
(1) Accuracy requirements
The precision requirements of the positioning guide holes and positioning holes should be very high to ensure the stability and reliability of the oil containment boom during assembly and use.
Positioning pilot holes and positioning holes should be manufactured using high-precision processing equipment and methods.
(2) Durability
Positioning holes and positioning holes should have good durability and be able to withstand long periods of use and frequent assembly and disassembly.
High-quality materials and processing processes should be selected to manufacture positioning pilot holes and positioning holes.
(3) Easy to operate
Positioning pilot holes and positioning holes should be designed with ease and efficiency of operation in mind.
The difficulty and time of assembly and disassembly should be minimized to improve production efficiency.
Through reasonable positioning guide holes and positioning holes design, can ensure the stability and reliability of the oil fence in the assembly and use process, improve its overall performance and life.